The first step after removing the trays from the aircraft is to remove all of the existing attach brackets. The radios were mounted in separate locations in a subpanel under the instrument panel. Now they will be in one stack in the instrument panel since a lot of room has been freed up.
2 -3" pieces of 3/4 angle were used to make the side angles. Side angles were drilled and attached to the trays with 8/32 screws and lock-nuts.
Radio stack was temp fitted to instrument panel and the final hole for the radio stack was enlarged slightly to allow the stack to fit at the top.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment